+Q:Does UFH in screed need to be heated up gradually?

A:Yes. This is in order to not shock the screed and cause cracks. Ideally the system is ramped up, starting at a low temperature and then raised by 0.5 or 1 degree a day, until optimum temperature is reached.

+Q:Should the pipe have a sleeve if it is running through/under a movement/expansion joint?

A: It is advised that if pipe is running in screed that will or may have a crack in it that it should be protected with a sleeve.